Trelander Community Centre (Phase2)
The Project Background  
Following the success of the first phase of this award winning community led project in autumn 2008, funding was secured for a second phase - the addition of a multi-use hall.  A bespoke glu-lam timber portal frame free spans the width of the hall into which the straw and wool filled pre-fabricated ecofab modules are fixed.  The building has a sedum roof, green oak cladding, and triple glazed high level windows some of which are motorised allowing controlled ventilation and day lighting. 
Despite the added complexity of connecting to an existing building the ecofab system proved to be adaptable and flexible in tackling this new building type.  The completed building envelope scored a very low air leakage rate of 1.7m3/m2/hr @ 50 Pascals, achieved through expert attention to design detail and careful control of factory and site construction.  The hall will open in May 2010.
 
 
 
ARCO2 House
Boundary Road
Dunmere
Bodmin
Cornwall
PL31 2RX
 
 
 
 
Directors: I Armstrong, N Davis & M Penk
Registered Office: ARCO2 House, Boundary Road, Dunmere, Bodmin, Cornwall PL31 2RX
Registered No. 06165154